55 Market Street, Sydney

Project Duration: Nov 2019 - April 2020

We have successfully completed the installation of base building ductwork package for this 22 level (including plantroom) commercial building in Sydney's busiest retail precinct within a tight timeframe given

Darling Park

Project Duration: March 2021 - May 2021

At Darling Park Tower 1, we delivered ductwork installation services inthe basement carpark and EOT area. Understanding the building operation must be kept running 24/7, we planned and carried out the work in a timely manner to minimise any disruption. The success of th whole project is always our ultimate goal, no matter the scale of the project that we work on.

Central Coast Clinical Research-Gosford Hospital

Project Duration: August 2020 - December 2020

This project has showcased our capability in terms of installation to meet the project's programme and quality of delivery. The project consists of 7 levels of health services fit-out work and ventilation system on the rooftop. We took extra care in management and logistical planning during the course of the project to ensure no disruption for the facility operation.

Darling Quarter

Project Duration: On Going

We are currently working on this project

  • Base building modification - AHUs existing ductwork demolition and replacing with new ductwork
  • Base building Upgrade - Ductwork demolition and relocation, End of Trips facilities, lobby air conditioning ductwork supply and installation

This project is a great example of our excellent coordination on site to assist the demolition of existing ductwork, relocation of huge smoke exhaust system and our ability of carrying out a design and construct type of project in terms of site-measuring, make-good works and ductwork designing to suit the existing elements.

ST George Private Hospital

Project Duration: December 2020 - January 2021

This project showcases our ability to quickly come up with a ductwork design for the ventilation system at St George Private Hospital. Our thorough site surveys and measuring, our proactive an innovative design proposal is the key to the successful delivery of this quick-turnaround project to meet the tight dealline.

Wynyard Shellhouse Pavillion

Project Duration: April 2021 - December 2021

A menzies bar and Bistro at bustling CBD loaded with historic vibe. IES was able to equip the bar with a sophisticated HVAC system that enhance the sense of hospitality.

A Dining Room is classic in theory, yet modern and forward-thinking in practice. The full exposed HVAC systeminstalled by IES is perfectly blended in the atmosphere.

Smithfield

Project Duration: February 2022 to April 2022

Complete the installation of HVAC ductwork for 8 units of quarantine accomocation facility in 8 weeks is a good example to demonstrate the capability and quality of IES

Australia Hub Level 12

Project Duration: May 2021

We provide ductwork supply and installation package at the newly constructed Brookfield Place Sydney, one of Australia’s premier commercial and retail precincts. This project showcases our capability of quick turnaround ductwork supply and site measure, followed by speedy and top-quality finishing installation to meet the tight deadline of 15-day rough in period for a 2500 square metre office.

Wynyard Clifford L23& L24

Project Duration: May 2022 to July 2022

6 weeks rough in and 2 weeks fit out for 2500m2 office setup. Smooth delivery with zero defects is a very convincing result to satisfy our client.

Westpoint Shopping Center

Project Duration: On going

Work commencing in a live shopping center. Size of duct work ranging from over 3M span to 150*150.